Screw Pile

Screw Pile

Highly Automated Production

Production of our Screw Piles takes place at our factory in Hedensted

Techincal information about the Screw Pile

Learn more about the screw pile, its properties, and installation methods here

Download techincal information here

Installation of the Screw Pile

Low noise and vibrationfree instalaltion with the Screw Pile

By means of a specially developed pile joint solution, the CPSP elements are fitted with a drilling point at the bottom and, at the top, connected to the next pile element if pile lengths exceeding 8 m are required.

Want to know more about the Screw Pile?

Fill out the contact form below or call +45 75 83 01 11

You can also go to our contact page to find a specific employee.